Atlas Engineering Group > Projects > Aviation > Runway Design 10R-28L

AEG Staff provided professional design and technical management services for ORD LLC O’Hare Runway Designers, JV on Chicago Department of Aviation’s O’Hare Modernization Program. They were on a team which prepared final design packages for the Runway 10R-28L project and to provide final design for adjacent runway projects. Runway 10R-28L is a 7,500-ft.-long, 150-ft. wide, and CAT II/III all-weather runway. Pavement bid specifications required the use of recycled roof shingles in the warm-mix asphalt for sub-layers; this was the first project certified by the FAA to use an environmentally-conscious asphalt blend.

Professional services provided as Runway Designer Team included: responsible for the design of 10R-28L’s earthwork, earthwork management, by stage grading, pavements, geometrics, various NAVAIDS sites grading, drainage grading and coordination, utilities grading and coordination, South Perimeter Road grading, tunnel grading coordination and various guard posts grading coordination.

Leave a Reply

Contact us today to learn more: info@aegroupltd.com