Atlas Engineering Group > Projects > Stormwater Management > Joliet Road Over Flagg Creek, Village of Indian Head Park

AEG provided design services for the hydraulic improvements required for the removal and replacement of the bridge superstructure and repairs of the substructure with vertical clearance improvements. AEG prepared a 404 Permit Application and engineering design and plan, preparation for bridge drainage and utilities, soil erosion control and detailed floodway cut impact exhibits.

Client:                     Millennia Professional Services (MPS)/Illinois Department of Transportation (IDOT)

Services:                 Phase II Engineering

Leave a Reply

Contact us today to learn more: info@aegroupltd.com