Atlas Engineering Group > Projects > Stormwater Management > IDOT District One, I-90 from I-190 East to IL 43 (Harlem Ave.)

Atlas Engineering, as a subconsultant, is responsible for project management, including QA/QC.  The project involves widening new highway drainage system and structure work including retaining wall construction/ reconstruction.  Phase I responsibilities include location design studies, intersection design studies, safety studies, crash analysis, traffic simulation modeling, capacity analysis, traffic staging analysis and cost estimating; location drainage studies and stormwater detention analyses.

Phase II responsibilities include proposed drainage systems; roadway plan & profile plans, cross sections, drainage plans, specifications & cost estimates and stormwater detention analyses and grading plans.

Client:                     HNTB/Illinois Chicago Department of Transportation (IDOT)

Services:                 Phase I and II Engineering

Leave a Reply

Contact us today to learn more: info@aegroupltd.com