Atlas Engineering Group > Projects > Construction Management > Boiler Replacement at Maintenance Facilities

AEG was the CM on this project located at M-2, M-4, M-5 and M-8 Maintenance Facilities. The scope of work included:
Removal and replacement of existing gas and water piping, vent draft ductwork, electric power feeds and existing boilers, and associated controls using LonWorks to communicate with existing building management system.

Leave a Reply

Contact us today to learn more: info@aegroupltd.com